Rule 5 Erosion Control Program
|
| |
Rule 5 - STORM WATER RUNOFF ASSOCIATED WITH
CONSTRUCTION ACTIVITY |
| |
Research over the past three decades has found that erosion rates from
construction sites are ten times higher than those measured on row
croplands and more than 100 times higher than erosion rates on well
vegetated lands. Soil loss from new development can range from 20 to 150 tons per
acre, per year. The national average for soil erosion from cropland is about 8 tones
per year. Soil lost to streams, rivers, and lakes have a profound effect on water
quality, including our drinking water. Furthermore, excessive erosion of soil into
ditches increases the frequency of ditch maintenance, which is an economic impact.
|
| |
|
| |
The purpose of 327 IAC 15-5 (Rule 5) is to reduce pollutants, principally
sediment as a result of soil erosion, in storm water discharges into surface
waters of the state. The requirements of Rule 5 apply to all persons
who are involved in construction activity (which includes clearing, grading,
excavation and other land disturbing activities) that results in the disturbance
of one (1) acre or more of total land area. If the
land disturbing activity results in the disturbance of less than
one (1) acre of total
land area, but is part of a larger common plan of development or sale (such as the
development of a subdivision or industrial park), it is still subject to storm water
permitting.
|
| |
|
| |
Those responsible for adhering to the rule are known as the project
"operators". Operators are required to do the following before starting a
construction
activity that will disturb 1 or more acres: |
| |
|
| |
1. Submit an Erosion and Sediment Control Plan (ESCP) to
the DeKalb County Soil and
Water Conservation District (projects in DeKalb County only). ESCPs must
be submitted BEFORE construction may begin.
|
| |
2.
File a Notice of Intent (NOI) on State Form 47487
to Indiana Department
Environmental Management (IDEM)
along with the following:
|
| |
** $100 check or money order payable to
IDEM
|
| |
** Verification of an approved plan
|
| |
** Submit to IDEM proof of publication in a newspaper of general circulation in
the affected area notifying the public that a construction activity is to commence. Include the start date, end date, and location of the project,
and the name and address or
phone number of the contact person.
|
| |
State forms and additional information may be obtained online at IDEM's
website:
|
| |
www.in.gov/idem |
| |
Click here for instructions on finding
Rule
5 information on the IDEM website
as of July 31, 2007 |